TERMS OF REFERENCE
for the current repair of the premises of the Olmazor Call Center
1. General Provisions
1.1. This Terms of Reference defines the requirements for the construction of the premises.
1.2. The facility must have customer access, secure equipment and comply with the bank's corporate standards.
2. Purpose of the object
2.1. The premises are designed to provide convenient and safe access to customers.
2.2. The design must provide protection against atmospheric influences, unauthorized access and vandalism.
3. Basic requirements
3.1. Type of construction: priming the ceiling in 1 layer with twig compositions, painting the ceiling with water-based twig paint, cleaning the walls from paint, beating plaster off the walls, complete leveling of the walls, wall sheathing with décor panels.
3.2. Gender:
Base – dismantling of MDF skirting boards, installation of self-leveling floor
Coating – dismantling of quartz vinyl flooring, installation of cement floor screed, installation of flooring from quartz vinyl tiles on glue.
3.3. Doors: replacement of the entrance door hinges, replacement of the front door closer
3.4. According to the proposed defective act.
|
DEFECTIVE ACT No1 |
|
||||||
|
№№ |
NAME OF WORKS AND RESOURCES |
UNIT |
QUANTITY |
|
|||
|
PER UNIT |
|
||||||
|
|
ROOM No 1 ( CLASSROOM ) |
|
|||||
|
1 |
DISMANTLING OF SUSPENDED CEILINGS OF THE "ARMSTRONG" TYPE |
m2 |
20,22 |
|
|||
|
2 |
INSTALLATION OF SUSPENDED CEILINGS OF THE "ARMSTRONG" TYPE |
m2 |
20,22 |
|
|||
|
3 |
PRIMING THE CEILING IN 1 LAYER WITH BRANCH COMPOSITIONS |
m2 |
12,4 |
|
|||
|
4 |
PAINTING THE CEILING WITH WATER-BASED PAINT OF BRANCHES |
m2 |
12,4 |
|
|||
|
5 |
CLEANING WALLS FROM PAINT |
m2 |
37,51 |
|
|||
|
6 |
PRIMING OF WALLS IN 1 LAYER |
m2 |
37,51 |
|
|||
|
7 |
SOLID WALL LEVELING |
m2 |
37,51 |
|
|||
|
8 |
PRIMING OF WALLS IN 1 LAYER |
m2 |
37,51 |
|
|||
|
9 |
PAINTING THE WALLS WITH WATER-BASED PAINT OF BRANCHES |
m2 |
19,57 |
|
|||
|
10 |
WALL CLADDING WITH DÉCOR PANELS |
m2 |
17,94 |
|
|||
|
|
ROOM No 2 ( CALL CENTER ) |
|
|||||
|
1 |
PRIMING THE CEILING IN 1 LAYER WITH BRANCH COMPOSITIONS |
m2 |
181,34 |
|
|||
|
2 |
PAINTING THE CEILING WITH WATER-BASED PAINT OF BRANCHES |
m2 |
181,34 |
|
|||
|
3 |
CLEANING WALLS FROM PAINT |
m2 |
415,10 |
|
|||
|
4 |
PLASTERING FROM WALLS |
m2 |
21,20 |
|
|||
|
5 |
PLASTERS FROM THE WALLS |
m2 |
21,20 |
|
|||
|
6 |
PRIMING OF WALLS IN 1 LAYER |
m2 |
415,10 |
|
|||
|
7 |
SOLID WALL LEVELING |
m2 |
415,10 |
|
|||
|
8 |
PRIMING OF WALLS AND SLOPES IN 1 LAYER |
m2 |
415,10 |
|
|||
|
9 |
PAINTING OF WALLS, SLOPES AND COLUMNS WITH WATER-BASED PAINT OF BRANCHES |
m2 |
250,10 |
|
|||
|
10 |
SHEATHING OF COLUMNS WITH DECORATIVE PANELS |
m2 |
30,95 |
|
|||
|
11 |
WALL CLADDING WITH DÉCOR PANELS |
m2 |
134,1 |
|
|||
|
|
ROOM No 3 (OFFICE OF THE HEAD) |
|
|||||
|
1 |
PRIMING THE CEILING IN 1 LAYER WITH BRANCH COMPOSITIONS |
m2 |
1,9 |
|
|||
|
2 |
PAINTING THE CEILING WITH WATER-BASED PAINT OF BRANCHES |
m2 |
1,9 |
|
|||
|
3 |
CLEANING WALLS FROM PAINT |
m2 |
30,73 |
|
|||
|
4 |
PRIMING OF WALLS IN 1 LAYER |
m2 |
30,73 |
|
|||
|
5 |
SOLID WALL LEVELING |
m2 |
30,73 |
|
|||
|
6 |
PRIMING OF WALLS IN 1 LAYER |
m2 |
30,73 |
|
|||
|
7 |
PAINTING OF WALLS AND SLOPES WITH WATER-BASED PAINT OF BRANCHES |
m2 |
15,55 |
|
|||
|
8 |
WALL CLADDING WITH DÉCOR PANELS |
m2 |
15,18 |
|
|||
|
|
ROOM No 4 ( DINING ROOM ) |
|
|||||
|
1 |
PRIMING THE CEILING IN 1 LAYER WITH BRANCH COMPOSITIONS |
m2 |
5,84 |
|
|||
|
2 |
PAINTING THE CEILING IN WATER-BASED PAINT OF BRANCHES |
m2 |
5,84 |
|
|||
|
3 |
CLEANING WALLS FROM PAINT |
m2 |
46,03 |
|
|||
|
4 |
PRIMING OF WALLS AND SLOPES IN 1 LAYER WITH BRANCH COMPOSITIONS |
m2 |
46,03 |
|
|||
|
5 |
SOLID WALL LEVELING |
m2 |
46,03 |
|
|||
|
6 |
PRIMING OF WALLS IN 1 LAYER |
m2 |
46,03 |
|
|||
|
7 |
PAINTING OF WALLS AND SLOPES IN WATER-BASED PAINT OF BRANCHES |
m2 |
32,79 |
|
|||
|
8 |
WALL CLADDING WITH DÉCOR PANELS |
m2 |
13,24 |
|
|||
|
|
ROOM No 5 ( BATHROOMS ) |
|
|||||
|
|
WOMEN'S BATHROOM |
|
|||||
|
1 |
PRIMING OF WALLS AND SLOPES IN 1 LAYER |
m2 |
53,42 |
|
|||
|
2 |
PAINTING OF WALLS AND SLOPES WITH WATER-BASED PAINT OF BRANCHES |
m2 |
53,42 |
|
|||
|
|
MEN'S BATHROOM |
|
|||||
|
1 |
PRIMING OF WALLS AND SLOPES IN 1 LAYER |
m2 |
53,42 |
|
|||
|
2 |
PAINTING OF WALLS AND SLOPES IN WATER-BASED PAINT OF BRANCHES |
m2 |
53,42 |
|
|||
|
|
OTHER WORKS |
|
|||||
|
1 |
REPLACEMENT OF SUSPENDED CEILING SLABS OF THE "ARMSTRONG" TYPE - 62 PCS |
M2 |
22,32 |
|
|||
|
2 |
CLEANING OF PREMISES FROM CONSTRUCTION WASTE |
TN |
10 |
|
|||
|
3 |
BAGGING OF CONSTRUCTION WASTE |
TN |
10 |
|
|||
|
4 |
TRANSPORTATION OF GARBAGE BY CAR FOR 15 KM, |
TN |
10 |
|
|||
|
5 |
FLOOR COVER MADE OF POLYETHYLENE FILM |
m2 |
600 |
|
|||
|
|||||||
|
DEFECTIVE ACT No 2 |
|||||||
|
№№ |
NAME OF WORKS AND RESOURCES |
UNIT |
QUANTITY |
||||
|
PER UNIT |
|||||||
|
1 |
2 |
3 |
4 |
||||
|
|
FINISHING WORKS |
||||||
|
|
ROOM No 1 ( CALL CENTER ) |
||||||
|
1 |
PRIMING THE CEILING IN 1 LAYER WITH BRANCH COMPOSITIONS |
m2 |
43,62 |
||||
|
2 |
PAINTING THE CEILING IN WATER-BASED PAINT OF BRANCHES |
m2 |
43,62 |
||||
|
3 |
CLEANING WALLS FROM PAINT |
m2 |
249,63 |
||||
|
4 |
PRIMING OF WALLS IN 1 LAYER |
m2 |
249,63 |
||||
|
5 |
SOLID WALL LEVELING |
m2 |
249,63 |
||||
|
6 |
PRIMING OF WALLS IN 1 LAYER |
m2 |
249,63 |
||||
|
7 |
PAINTING WALLS IN WATER-BASED PAINT OF BRANCHES |
m2 |
139,63 |
||||
|
8 |
SHEATHING OF COLUMNS WITH DECORATIVE PANELS |
m2 |
6,4 |
||||
|
9 |
WALL CLADDING WITH DÉCOR PANELS |
m2 |
103,6 |
||||
|
10 |
DISMANTLING OF MDF SKIRTING BOARDS |
m.p. |
130 |
||||
|
11 |
DISMANTLING OF QUARTZ VINCENT FLOORING |
m2 |
185,3 |
||||
|
12 |
DISMANTLING OF CEMENT FLOOR SCREED |
m2 |
185,3 |
||||
|
13 |
INSTALLATION OF CEMENT FLOOR SCREED |
m2 |
185,3 |
||||
|
14 |
INSTALLATION OF SELF-LEVELING FLOOR |
m2 |
185,3 |
||||
|
15 |
INSTALLATION OF FLOORING MADE OF QUARTZ VINYL TILES ON GLUE |
m2 |
185,3 |
||||
|
16 |
INSTALLATION OF MDF SKIRTING BOARDS |
m.p. |
130 |
||||
|
|
ROOM No 2 ( BATHROOMS ) |
||||||
|
|
WOMEN'S BATHROOM |
||||||
|
1 |
PRIMING THE CEILING IN 1 LAYER WITH BRANCH COMPOSITIONS |
m2 |
4,68 |
||||
|
2 |
PAINTING THE CEILING IN WATER-BASED PAINT OF BRANCHES |
m2 |
4,68 |
||||
|
3 |
PRIMING WALLS IN 1 LAYER WITH BRANCH COMPOSITIONS |
m2 |
19,2 |
||||
|
4 |
PAINTING WALLS IN WATER-BASED PAINT OF BRANCHES |
m2 |
19,2 |
||||
|
|
MEN'S BATHROOM |
||||||
|
1 |
PRIMING THE CEILING IN 1 LAYER WITH BRANCH COMPOSITIONS |
m2 |
4,68 |
||||
|
2 |
PAINTING THE CEILING IN WATER-BASED PAINT OF BRANCHES |
m2 |
4,68 |
||||
|
3 |
PRIMING WALLS IN 1 LAYER WITH BRANCH COMPOSITIONS |
m2 |
19,2 |
||||
|
4 |
PAINTING WALLS IN WATER-BASED PAINT OF BRANCHES |
m2 |
19,2 |
||||
|
|
OTHER WORKS |
||||||
|
14 |
CLEANING OF PREMISES FROM CONSTRUCTION WASTE |
TN |
10 |
||||
|
15 |
BAGGING OF CONSTRUCTION WASTE |
TN |
10 |
||||
|
16 |
TRANSPORTATION OF GARBAGE BY CAR FOR 15 KM, |
TN |
10 |
||||
|
17 |
FLOOR COVER MADE OF POLYETHYLENE FILM |
m2 |
200 |
||||
DEFECTIVE ACT No 3
|
№№ |
NAME OF WORKS AND RESOURCES |
UNIT |
QUANTITY |
|
|
PER UNIT |
|
|||
|
1 |
2 |
3 |
4 |
|
|
|
FINISHING WORKS |
|||
|
|
ROOM No 1 |
|||
|
1 |
PRIMING THE CEILING IN 1 LAYER WITH BRANCH COMPOSITIONS |
m2 |
81,72 |
|
|
2 |
PAINTING THE CEILING IN WATER-BASED PAINT OF BRANCHES |
m2 |
81,72 |
|
|
3 |
CLEANING WALLS FROM OLD PAINT |
m2 |
36,6 |
|
|
4 |
COATING WATERPROOFING OF WALLS |
m2 |
36,6 |
|
|
5 |
SOLID WALL LEVELING |
m2 |
36,6 |
|
|
6 |
WALL PUTTY |
m2 |
103,46 |
|
|
7 |
PRIMING WALLS IN 1 LAYER WITH BRANCH COMPOSITIONS |
m2 |
103,46 |
|
|
8 |
PAINTING WALLS IN WATER-BASED PAINT OF BRANCHES |
m2 |
103,46 |
|
|
|
|
|
|
|
|
|
ROOM No 2 |
|||
|
1 |
PRIMING THE CEILING IN 1 LAYER WITH BRANCH COMPOSITIONS |
m2 |
44,1 |
|
|
2 |
PAINTING THE CEILING IN WATER-BASED PAINT OF BRANCHES |
m2 |
44,1 |
|
|
3 |
CLEANING WALLS FROM OLD PAINT |
m2 |
40,1 |
|
|
4 |
COATING WATERPROOFING OF WALLS |
m2 |
40,1 |
|
|
5 |
SOLID WALL LEVELING |
m2 |
40,1 |
|
|
6 |
WALL PUTTY |
m2 |
110,4 |
|
|
7 |
PRIMING WALLS IN 1 LAYER WITH BRANCH COMPOSITIONS |
m2 |
110,4 |
|
|
8 |
PAINTING WALLS IN WATER-BASED PAINT OF BRANCHES |
m2 |
110,4 |
|
|
|
ROOM No 3 |
|||
|
1 |
PRIMING THE CEILING IN 1 LAYER WITH BRANCH COMPOSITIONS |
m2 |
83,1 |
|
|
2 |
PAINTING THE CEILING IN WATER-BASED PAINT OF BRANCHES |
m2 |
83,1 |
|
|
3 |
CLEANING WALLS FROM OLD PAINT |
m2 |
38,8 |
|
|
4 |
COATING WATERPROOFING OF WALLS |
m2 |
38,8 |
|
|
5 |
SOLID WALL LEVELING |
m2 |
38,8 |
|
|
6 |
WALL PUTTY |
m2 |
115,9 |
|
|
7 |
PRIMING WALLS IN 1 LAYER WITH BRANCH COMPOSITIONS |
m2 |
115,9 |
|
|
8 |
PAINTING WALLS IN WATER-BASED PAINT OF BRANCHES |
m2 |
115,9 |
|
|
|
ROOM No 4 ( CORRIDOR ) |
|||
|
1 |
PRIMING THE CEILING IN 1 LAYER WITH BRANCH COMPOSITIONS |
m2 |
28,4 |
|
|
2 |
PAINTING THE CEILING IN WATER-BASED PAINT OF BRANCHES |
m2 |
28,4 |
|
|
3 |
CLEANING WALLS FROM OLD PAINT |
m2 |
26 |
|
|
4 |
COATING WATERPROOFING OF WALLS |
m2 |
26 |
|
|
5 |
SOLID WALL LEVELING |
m2 |
26 |
|
|
6 |
WALL PUTTY |
m2 |
74,1 |
|
|
7 |
PRIMING WALLS IN 1 LAYER WITH BRANCH COMPOSITIONS |
m2 |
74,1 |
|
|
8 |
PAINTING WALLS IN WATER-BASED PAINT OF BRANCHES |
m2 |
74,1 |
|
|
9 |
DISMANTLING OF PORCELAIN STONEWARE FLOOR COVERING 600X600 |
m2 |
12 |
|
|
10 |
PORCELAIN STONEWARE FLOOR COVERING 600X600 |
m2 |
12 |
|
|
|
ROOM No 5 ( CORRIDORS ) |
|||
|
1 |
PRIMING THE CEILING IN 1 LAYER WITH BRANCH COMPOSITIONS |
m2 |
70,81 |
|
|
2 |
PAINTING THE CEILING IN WATER-BASED PAINT OF BRANCHES |
m2 |
70,81 |
|
|
3 |
PLASTERBOARD WALL CLADDING |
m2 |
54,9 |
|
|
4 |
CLADDING OF WINDOW PLASTERBOARD SLOPES |
m2 |
1,2 |
|
|
5 |
CLEANING WALLS FROM OLD PAINT |
m2 |
76,6 |
|
|
6 |
COATING WATERPROOFING OF WALLS |
m2 |
76,6 |
|
|
7 |
SOLID WALL LEVELING |
m2 |
76,6 |
|
|
8 |
WALL PUTTY |
m2 |
220,81 |
|
|
9 |
PRIMING WALLS IN 1 LAYER WITH BRANCH COMPOSITIONS |
m2 |
220,81 |
|
|
10 |
PAINTING WALLS IN WATER-BASED PAINT OF BRANCHES |
m2 |
220,81 |
|
|
11 |
INSTALLATION OF HATCHES (MDF DOORS) 900X1300; 600X1100 |
M2 |
1,83 |
|
|
12 |
DISMANTLING OF PORCELAIN STONEWARE FLOOR COVERING 600X600 |
m2 |
21,75 |
|
|
13 |
PORCELAIN STONEWARE FLOOR COVERING 600X600 |
m2 |
21,75 |
|
|
|
ROOM No 6 ( ELEVATOR ) |
|||
|
1 |
PAINTING THE CEILING IN WATER-BASED PAINT |
m2 |
47,125 |
|
|
2 |
PLASTERBOARD WALL CLADDING (PLASTER) |
m2 |
65,4 |
|
|
3 |
WALL PUTTY |
m2 |
142,37 |
|
|
4 |
PRIMING OF WALLS IN 1 LAYER WITH COMPOUNDS |
m2 |
142,37 |
|
|
5 |
PAINTING WALLS IN WATER-BASED PAINT |
m2 |
142,37 |
|
|
6 |
INSTALLATION OF PITS FOR PUMPS |
PCS |
2 |
|
|
|
ROOM No 7 (WOMEN'S BATHROOM) |
|||
|
1 |
PRIMING THE CEILING IN 1 LAYER WITH BRANCH COMPOSITIONS |
m2 |
14,24 |
|
|
2 |
PAINTING THE CEILING IN WATER-BASED PAINT OF BRANCHES |
m2 |
14,24 |
|
|
3 |
WALL PUTTY |
m2 |
41,46 |
|
|
4 |
PRIMING WALLS IN 1 LAYER WITH BRANCH COMPOSITIONS |
m2 |
41,46 |
|
|
5 |
PAINTING WALLS IN WATER-BASED PAINT OF BRANCHES |
m2 |
41,46 |
|
|
6 |
INSTALLATION OF DOORS MDF 2100X800 - WITH PCS |
m2 |
5,04 |
|
|
|
ROOM No 8 (MEN'S BATHROOM) |
|||
|
1 |
PRIMING THE CEILING IN 1 LAYER WITH BRANCH COMPOSITIONS |
m2 |
14,24 |
|
|
2 |
PAINTING THE CEILING IN WATER-BASED PAINT OF BRANCHES |
m2 |
14,24 |
|
|
3 |
WALL PUTTY |
m2 |
41,46 |
|
|
4 |
PRIMING WALLS IN 1 LAYER WITH BRANCH COMPOSITIONS |
m2 |
41,46 |
|
|
5 |
PAINTING WALLS IN WATER-BASED PAINT OF BRANCHES |
m2 |
41,46 |
|
|
6 |
INSTALLATION OF DOORS MDF 2100X800 - WITH PCS |
m2 |
5,04 |
|
|
|
ROOM No 9 |
|||
|
1 |
PRIMING THE CEILING IN 1 LAYER WITH BRANCH COMPOSITIONS |
m2 |
41,52 |
|
|
2 |
PAINTING THE CEILING IN WATER-BASED PAINT OF BRANCHES |
m2 |
41,52 |
|
|
3 |
CLEANING WALLS FROM OLD PAINT |
m2 |
26,3 |
|
|
4 |
COATING WATERPROOFING OF WALLS |
m2 |
26,3 |
|
|
5 |
SOLID WALL LEVELING |
m2 |
26,3 |
|
|
6 |
WALL PUTTY |
m2 |
77,98 |
|
|
7 |
PRIMING WALLS IN 1 LAYER WITH BRANCH COMPOSITIONS |
m2 |
77,98 |
|
|
8 |
PAINTING WALLS IN WATER-BASED PAINT OF BRANCHES |
m2 |
77,98 |
|
|
|
ROOM No 10 |
|||
|
1 |
PRIMING THE CEILING IN 1 LAYER WITH BRANCH COMPOSITIONS |
m2 |
83,45 |
|
|
2 |
PAINTING THE CEILING IN WATER-BASED PAINT OF BRANCHES |
m2 |
83,45 |
|
|
3 |
CLEANING WALLS FROM OLD PAINT |
m2 |
41,4 |
|
|
4 |
COATING WATERPROOFING OF WALLS |
m2 |
41,4 |
|
|
5 |
PLASTERING OF SLOPES |
m2 |
2,7 |
|
|
6 |
COMPLETE LEVELING OF WALLS AND SLOPES |
m2 |
44,1 |
|
|
7 |
WALL PUTTY |
m2 |
125,28 |
|
|
8 |
PRIMING OF WALLS AND SLOPES IN 1 LAYER WITH BRANCH COMPOSITIONS |
m2 |
125,28 |
|
|
9 |
PAINTING OF WALLS AND SLOPES WITH WATER-BASED PAINT OF BRANCHES |
m2 |
125,28 |
|
|
10 |
INSTALLATION OF HATCHES (MDF DOORS) 1400X1400; 500X500 |
M2 |
2,21 |
|
|
|
OTHER WORKS |
|||
|
1 |
REPLACEMENT OF FRONT DOOR HINGES |
PCS |
4 |
|
|
2 |
REPLACING THE FRONT DOOR CLOSER |
PCS |
1 |
|
|
3 |
CLEANING OF PREMISES FROM CONSTRUCTION WASTE |
TN |
20 |
|
|
4 |
BAGGING OF CONSTRUCTION WASTE |
TN |
20 |
|
|
5 |
TRANSPORTATION OF GARBAGE BY CAR FOR 15 KM, |
TN |
20 |
|
|
6 |
FLOOR COVER MADE OF POLYETHYLENE FILM |
m2 |
470 |
|
5. Quality and Work Requirements
5.1. All work must be carried out in accordance with the current building codes and rules.
5.2. The Contractor shall ensure:
supply of all materials;
installation and construction works;
cleaning of the territory after the completion of work.
6. Terms of work
6.1. The term of work performance is determined by the contract, approximately 20 calendar days from the date of signing.
7. Warranty
7.1. The warranty for the work and materials performed is at least 12 months.
8. Qualification requirements for the contractor
8.1. Experience in performing similar work.
8.2. Availability of qualified personnel.
8.3. Compliance with safety regulations during the performance of work.
9. Qualification requirements for the contractor
8.1. Experience in performing similar work.
8.2. Availability of qualified personnel.
8.3. Compliance with safety regulations during the performance of work.
Contact Information:
• Email for tender proposals: TenderAnorbank@anorbank.uz
• EXAT email (for official inquiries): ANORBANK@exat.uz
Please, introduce yourself to start the conversation